The main cost drivers
Size sets the baseline: more rooms and bathrooms mean more paint, more cleaning and more small repairs. Condition moves the number most. A unit left clean with a few scuffs is a short job; a unit with left-behind furniture, heavy grease and wall damage is several jobs.
Paint scope is the next biggest variable: touch-ups on trim and high-traffic walls cost far less than a full repaint, especially if the colour changes. Finally, a tight deadline may need more people at once.
The cost you don't see on the quote
Every vacant day costs a day of rent. A cheaper quote that takes a week longer because trades are booked separately can cost more overall. When comparing quotes, compare the ready date as well as the price.
How to get a quote you can compare
Send clear photos of every room, a short video, the unit size and the date it must be ready. Ask for a quote that lists each task by room, who supplies materials, and what is excluded. Ask how additional damage found during work is handled; the answer should be a written change, not a surprise on the invoice.
Where published ranges fit
Starting-at ranges help with budgeting, but the written quote from the actual unit is what counts. Our pricing page lists current ranges when they are published.
What moves a turnover quote
| Factor | Lower cost | Higher cost |
|---|---|---|
| Condition | Clean, light wear | Items left, grease, damage |
| Paint | Touch-ups, same colour | Full repaint, colour change |
| Repairs | Standard parts | Special-order parts |
| Deadline | Standard schedule | Same-week move-in |
| Access | House, easy parking | Managed building, elevator booking |
Working checklist
- Photos of every room and a short video
- Unit size and ready date
- Paint colour and sheen if known
- Building rules and access details
- Ask for itemised tasks and exclusions
Questions about this guide
Why won't anyone give a price over the phone?
Condition varies too much between units. A price without photos is a guess that usually changes on site.
Is a full repaint always necessary?
No. If the colour is known and walls are in fair shape, touch-ups are often enough.
Are cleanouts included in the turnover price?
Only if they are listed. Large amounts of left-behind items are usually quoted as a separate line.
Do you offer plans for multiple units?
Yes. Recurring turnover plans hold standing slots for portfolios.